← Home
Runway-end Northing/Easting must be entered in State Plane feet for the project zone. The airport lookup converts NASR lat/lon thresholds automatically; manual entry is not converted.
Exhibit A Property Analysis
ARP SOP 3.00 parcel inventory & AC 150/5300-13B design-surface overlay — advisory property-interest indications — beta
Runway (existing configuration)Step 1
Low end
High end
ParcelsStep 2
Up to 100 parcels, 3–200 vertices each.
AnalyzeStep 3